 |
 |
| The entire original roof was missing so everything had to
be rebuilt from the frame up |
A bit tricky to rebuild a roof when there is no roof to
walk on |
 |
 |
| New rafters, substrate and 30 lb. felt was attached |
before the torch down membrane was applied. |
 |
 |
| The solid original frame was inspected, sanded to metal
before primer paint was applied. |
A fresh layer of flat black top coat was then applied. |