O'Mahony Diner Roof reassembly and membrane

You'll want to watch your step when doing this kind of work. New 3/4 inch plywood was secured to the wood rafters. Insulation was installed as appropriate.
With an all new 3/4 inch substrate installed we then .... secured 30 lb. roofing felt before the final membrane.
Torch down membrane was secured over the roof felt . Silver elastomeric paint will be applied once the membrane has cured.

Up ] frame restoration ] roof teardown ] [ new roof ]